D-B Turns 100!
Dobyns-Bennett
High School, the name anyway, turns 100 this school year.
Whether
you count the centennial date as the start of school, which is Aug. 3, 2026 in Kingport
this school year, or the centennial of the actual date of opening of the
original D-B, which was Sept 7, 1926, D-B is 100.
Of course
many of us know the school itself has had two buildings. We refer to them as The
Old School, the stately Georgian Revival style building at 1200 Wateree Street,
which opened on Sept. 7, 1926 to much fanfare. Or The New School, the
Jetsons-style pod building at 1644 Fort Henry Drive, which opened on Aug. 31, 1967
to even greater fanfare: the new school was much more expensive - $6 million vs.
$300,000 in 1926 – plus more students (197 vs. 1,713) and more Kingsport
residents (10,000 vs. 30,000). Of course that additional fanfare could be
attributed to a much larger circulation newspaper (3,312 vs. 28,251) and the
addition of two local TV newsrooms plus the local powerhouse news department at
WKPT-AM-FM (WKPT-TV didn’t sign on for another two years).
For those
of us who went to the Old School, there will always be that demarcation: the
Old School and the New School, even though the Old School was only D-B for 42
years. The New School has been D-B for 58 years and counting. I don’t expect to
be around to see the opening of The Newer School which isn’t even being talked
about.
For those who remember the Old School or even those who wonder what it was like, I have assembled a portfolio of photos from those early decades of D-B.
In April 1926, the Kingsport Times
devoted prominent front-page coverage to what might today seem like a routine
administrative detail: the awarding of a municipal contract for school lockers.
This detailed reporting highlights just how central the construction of the new
Dobyns-Bennett High School was to the civic pride and daily consciousness of
the growing town.
The newspaper treated the locker selection with
the weight of major public news. Rather than merely reporting the winning
vendor, the article meticulously documented the entire competitive bidding
process. Readers were provided with an exact breakdown of all five bids
submitted—ranging from the winning offer of $3,352.50 by the Office Supply
Company of Johnson City up to $3,958.40 from a St. Louis manufacturer. Every
dollar, company name, and location was laid out for public scrutiny, reflecting
a strong emphasis on municipal transparency and financial accountability.
Furthermore, the article went to great lengths
to describe the technical specifications of the equipment itself, detailing the
installation of 468 recessed 60-inch corridor lockers and 75 specialized
gymnasium locker sets. It emphasized that City Manager Frank L. Cloud and
School Superintendent Ross N. Robinson personally inspected product samples to
ensure quality, underscoring the hands-on care town leadership brought to the
project.













0 Comments:
Post a Comment
<< Home